# Double-Down on STIP Successes (STIP-Bridge)

**URL:** <https://forum.arbitrum.foundation/t/double-down-on-stip-successes-stip-bridge/22353>\
**Category:** Finalized AIPs\
**Tags:** proposal\
**Created:** [March 12, 2024, 1:26am UTC](https://forum.arbitrum.foundation/t/double-down-on-stip-successes-stip-bridge/22353 "2024-03-12T01:26:16Z")\
**Posts on this page:** 1\
**Showing post:** 98

<div class="post-metadata">

**Author:** ![BlockworksResearch](https://yyz1.discourse-cdn.com/flex029/user_avatar/forum.arbitrum.foundation/blockworksresearch/32/14962_2.png) [@BlockworksResearch](https://forum.arbitrum.foundation/u/BlockworksResearch)\
**Post date:** [May 16, 2024, 6:43pm UTC](https://forum.arbitrum.foundation/t/double-down-on-stip-successes-stip-bridge/22353/98 "2024-05-16T18:43:23Z")

</div>

Blockworks Research has posted support material to help the community evaluate STIP-Bridge applicants who don’t automatically require a challenge vote on Snapshot.

> [@ARDC Research Deliverables](https://forum.arbitrum.foundation/t/stip-analysis-ardc-research-deliverables/23438/3):
>
> STIP-Bridge – Support Material for the Community To help community members and delegates form a holistic view of STIP-Bridge applicants that aren’t automatically required to go through a challenge vote on Snapshot (i.e., projects that have applied for a STIP-Bridge allocation before the initial deadline of May 3rd, 2024), Blockworks Research, acting as one of the Research Members for the ARDC, is sharing a workbook that includes qualitative data on the aforementioned applicants’ utilized incenti…

---

_[View the full topic](https://forum.arbitrum.foundation/t/double-down-on-stip-successes-stip-bridge/22353)._
